Configure RS-485 ConfigNode for another project - Step-by-Step WO

NOTE

notice

Reset ConfigNode for new projects

Configured ConfigNodes can cause problems in new projects.

  1. Reset ConfigNode as described before using it in a new project.
  1. Reset the WaveNet settings of the ConfigNode (hardware reset, see Resetting the WaveNet/network configuration of the GatewayNode).
  2. Connect ConfigNode to a new project.
  3. Determine/set the IP address (see Search GatewayNode and Assign IP address).
  4. Add the ConfigNode with SmartIntego Manager (see Configure RS-485 ConfigNode).