Illuminate WaveNet - Step-by-Step WO

Before ordering the components, measure the planned WaveNet in the building. Thorough, planned illumination ensures the following objectives (in contrast to the Pi-mal thumb method):

  • Suitable locations for the GatewayNodes:
    • Interference-free connection to locking device (use reflections from walls, avoid radio shadows from door frames)
    • Fulfilled specifications of architects/builders regarding the visibility of the components
    • Compliant fire protection and escape route regulations
  • Minimum number of GatewayNodes
  • Use of existing cabling and thus
  • Reduction of set-up costs