Illuminate WaveNet - Step-by-Step WO
Before ordering the components, measure the planned WaveNet in the building. Thorough, planned illumination ensures the following objectives (in contrast to the Pi-mal thumb method):
- Suitable locations for the GatewayNodes:
- Interference-free connection to locking device (use reflections from walls, avoid radio shadows from door frames)
- Fulfilled specifications of architects/builders regarding the visibility of the components
- Compliant fire protection and escape route regulations
- Minimum number of GatewayNodes
- Use of existing cabling and thus
- Reduction of set-up costs