Commissioning the SmartIntego project - Step-by-Step WO
There are several commissioning variants available (see Planning the installation process) that require specific steps. The following chapters describe the individual steps described in detail.
Further information
- Creating, expanding and importing a name list
- Document system
- Install SmartIntego tool
- Update SmartIntego tool (WO)
- Createing a SmartIntego project
- Create, modify and delete construction site whitelist
- Card configuration setup
- Creating and loading a template for card configurations
- Set coupling duration
- Configuring GatewayNodes (TCP)
- RS-485 ConfigNode
- Setting up SmartIntego Manager
- WaveNet global settings
- Add GatewayNode
- Add LockNodes
- Programme locking device
- SmartHandle: Configure DoorMonitoring
- SmartHandle: Configure Escape&Return
- Configure PIN code keypad
- Configure Node IO
- Managing locking devices in the SmartIntego tool (WO)
- Check WaveNet
- Automatically assign LockNodes
- Connecting SmartIntego to the integrator system