Planning the installation process - Step-by-Step WO
Commissioning of your SmartIntego system consists of two steps:
- Establish infrastructure and
- Add and programme locking devices.
You can perform these steps in different ways. Choosing the right route for you is influenced by:
- Required processes in the project
- Compatibility of your SmartIntego components with the integrator system
- Integrator system infrastructure
The scenarios described are examples. They serve as templates and can be individually adapted or redesigned.
NOTE
Functional test before installation
Before installing the lock in the door, a function test of the system (Lock, GatewayNode and Integrator System together) is strongly recommended. Without the function test, when installing the lock in the door, there is a risk that you may lock yourself out and no longer be able to open the door. Since the tests are individual for each integrator system, they are not explicitly mentioned in the following procedures.
Further information
- TCP: Installation according to WaveNet illumination
- TCP: On-site installation (automatic WaveNet configuration)
- TCP: On-site installation (manual WaveNet configuration)
- TCP: Prepared installation (construction site whitelist)
- TCP: Prepared installation (Integrator Whitelist)
- RS-485: On-site installation (manual WaveNet configuration)
- RS-485: Prepared installation (construction site whitelist)