Restoring a backup - Step-by-Step SVCN

If you encounter problems with the project file, you can import an existing backup or extract the project file from an existing XML configuration file exported from the SmartIntego tool (SVCN).

Both files are password protected. You still need the project password to recover/edit the project file.

NOTE

notice

Restoring old versions

The hardware configuration in old backup files may differ from the current hardware configuration.

  1. You still need the project password to recover/edit the project file.
  2. If necessary, correct existing differences manually.

Restoring a project with backup file

  1. Backup file available.
  1. Copy the last backup file known to work into your working directory.
  2. Open the backup file with the SmartIntego SVCN tool.
  3. Enter the project password.
  1. Configuration loaded at time of backup.

Extracting a project from XML file

  1. XML file available (exported from SmartIntego SVCN tool).
  1. Open the XML file with the SmartIntego Config Tool.
  2. Via File and Export select the entry SmartIntego Project File.
  3. Project file (*.ikp) restored.
  4. Continue restoring the backup with the extracted project file.

NOTE

notice

Loss of the project file (*.ikp)

If the project file is lost despite a backed up environment and backup, you will no longer be able to continue working with the existing project.

  1. Reset the locking devices with the locking system password.
  2. Then reprogram the entire locking system.