Synchronization - System description WO

During a communication in WaveNet, the data packages are verified several times internally in order to additionally secure the communication.

The connection between GatewayNodes and the integrator system can be interrupted, for example by restarting the GatewayNodes or the integrator system. Some checksums need to be synchronized again after the connection has been lost.

The integrator system and SmartIntego components automatically synchronize the checksums. If the checksums have not been synchronized automatically, synchronization is performed at the latest during the first active communication. The user must then hold their card again in front of the reader.