Initial operation - GatewayNode 3

  1. Install the unit (see Installation).
  2. Remove the lid.
  3. Connect a network cable and power supply and perform initial configuration (see Initial configuration/find in LAN).
  4. Place the lid on the base plate again.
  5. GatewayNode 3 lights up blue and is ready for operation (see Signalling).
  6. Integrate the GatewayNode 3 into the management software.
  1. GatewayNode 3 is securely configured.

SmartIntego GatewayNode 3

You can manage network-compatible locking devices in SmartIntego wirelessly with GatewayNode 3. For details, see: